The Optipump prototype is undergoing performance testing at IRIS

December 2011
 

The testphase of the Optipump prototype has started and the pump are performing very well. The test are scheduled to be finished at the end og January 2012.
A demonstrations of the pump will be held at week 2 of 2012.


[Back]
© Copyright 2012 OPTIPUMP AS
:
Fabrikkveien 9, 4033 Stavanger
:
Phone: +47 51 81 64 80
:
Mobile: +47 916 23 067
:


Developed by NetPower