The Prototype Project

As per June 2010.



Note: The movie requires Adobe Flash player 10.0 - To get it: http://get.adobe.com/flashplayer/

A film by Urban Allegiance ( http://www.urbanallegiance.no/ )



 



The Optipump™ withstood 540 bar (7800 psi) during a 15 minutes pressure test,

the 26th of May 2009








Pump and control cabinet mounted on skid - May 13th 2009



 



                                Finalizing the assembly process, April 21th 2009 





 



The 3 fluid ends and the upper housing in place, March 16th 2009



 









 

Crankshaft lifted into pump housing, February 19th 2009                                  Valve block





First main bearing/connecting rod                           The first pump assembly step was to verify

mounted on the crankshaft.                                    that the main bearings matched its housing.



 

Our partners StatoilHydro and Innovation Norway enthusiastically inspected the Optipump™ parts on January 15th this year.



 

 